Project Management SOFTWARE DEVELOPEMENT Project Phasing To ensure the implementation of large-scale software development projects, they need to be broken down into more manageable project components. With this thinking we are going to begin our project by clearly mapping out the life of the project and how we intend to follow all the deadlines and goals. Before we begin the project, I must first phase the project and that begins by looking at the user requirements we have been tasked with by the client. The term "user requirements" refers to exactly what it sounds like. They are the end user's requirements. These specifications specify how a facility, piece of equipment, or process should perform in terms of the product tobe manufactured, required throughput, and manufacturing conditions. However, the reason we are dividing the project into smaller tasks is so that a set task can correspond to each and every stage of the methodology. In our case it will be labelled an “agile sprint”, this may or may not be a collection of tasks but will be decided at a later of date. I already analyzed extensively the project life cycle in learning Aim A but will now look into in context of my current project. lOMoAR cPSD|3013804 Project concept initiation – During this phase, which is currently ongoing, I as the head of project management will summarize all the costs, benefits, user requirements and requests with the feedback from the client and all stakeholders who have input on this project. I will carry out this phase, through many different means: Identifying stakeholders A project scope meeting Breaking down requirements into smaller non-functional requirements Acceptance of requirements documentation Budgetary requirements Risks and constraints Project Initiation document All of these documents/feedback will provide adequate information and scope for stakeholders and product owner to give the greenlight for the project by highlighting the requirements and constraints needed. Definition and planning - During the definition and planning stage we must geton with the tasks at hands as itis an imperative part of the project life cycle and will most definitely be integrated within our use of the agile methodology for the software production. It will be a phase of continuation from the concept initiation including some important documents that will most definitely be needed to produce in this stage: Scope and Budget (further developed from the initial documents) Work breakdown and schedule Gantt Chart Communication Plan Risk Management (in more depth) Launch and Execution – Although concept gathering and planning isan important step for every project and its development it is not the be all and end all of project management and the software development. The execution of all the hard work put into the planning is just as if not more important than the processes before it with this in mind I have put in steps to place more importance on the execution phase for example: PAGE 1 lOMoAR cPSD|3013804 PAGE 2 Placing importance on status and tracking to make sure all targets are met Key performance indicators and using a range of different software’s Quality indicators (How the quality of the software is reflected) Forecasts Performance and control – As contracted for EBITS I must do all that is possible to ensure quality and performance of the project and making sure that all workers are working at full capacity, we can achieve this through a variety of ways, but one key aspect is incentives and deliverables. By setting realistic and attainable targets with the addition of incentives it boosts output and morale for workers, other things we will do to accomplish this: Objectives (making them realistic and attainable to not strain workers) Quality deliverables Effort & cost tracking Performance (vague but an essential tool to look at) Project Close - We must ascertain to keep stakeholders and clients at EBITS happy as I am contracted to them and the project must serve the purpose, with this in mind producing a solid project closure. We will hold an immediate reflection meeting called the “postmortem”to reflect on the failures and successes of the project and complete all the needed documents: In depth postmortem Project punchline Reporting Project scope meeting Initial email to all EBITS 

No comments found.
Login to post a comment
This item has not received any review yet.
Login to review this item
No Questions / Answers added yet.
Price $17.00
Add To Cart

Buy Now
Category exam bundles
Comments 0
Rating
Sales 0

Buy Our Plan

We have

The latest updated Study Material Bundle with 100% Satisfaction guarantee

Visit Now
{{ userMessage }}
Processing