Question 1 Correct 1.00 points out of 1.00 The owner determines the means, methods, techniques, sequences, and procedures of the actual construction work. Select one: True False Question 2 Correct 1.00 points out of 1.00 In a construction contract, the actual authority is what is in the contract documents. Select one: True False The correct answer is 'False'. The correct answer is 'True'.