If unused mortar stiffens due to hydration of cement, what must you do? - ✔✔Discard the mortar

What minimum time must you wait before caulking or grouting new tiles? - ✔✔24-48 Hours

How long should you wait before installing tile on a shower pan? - ✔✔24 Hours

Unstable dry rock, angular gravel, sandy loam, and cohesive soils having compressive strengths greater

than 0.5 and less than 1.5 tons/sq ft (tsf), are typical examples of: - ✔✔Type-B Soils

If 65 street lights are fed by a 2275 volt series circuit, what is the voltage across each light? - ✔✔35V

In a series circuit, the total voltage is divided equally.

For safety reasons, the maximum simple slope of an excavation, up to 20 ft deep, in Type-B soil is: -

✔✔1:1 (45°)

A Pittsburgh joint is used in: - ✔✔HVAC ductwork

The drain for a pressure relief valve on a water heater should be extended to: - ✔✔The outside of the

building

What is the minimum slope toward the drain of a shower pan? - ✔✔1/4" per foot (2%)

No comments found.
Login to post a comment
This item has not received any review yet.
Login to review this item
No Questions / Answers added yet.
Price $14.00
Add To Cart

Buy Now
Category Exams and Certifications
Comments 0
Rating
Sales 0

Buy Our Plan

We have

The latest updated Study Material Bundle with 100% Satisfaction guarantee

Visit Now
{{ userMessage }}
Processing