1. What is the primary goal of designing a production system?
a) Maximizing production costs
b) Minimizing production costs
c) Maximizing production downtime
d) Minimizing product quality
Answer: b) Minimizing production costs
Rationale: The primary goal of designing a production system is to find
ways to minimize costs while maximizing efficiency.
2. Which of the following is NOT a key factor to consider when planning
a production system?
a) Capacity
b) Location
c) Cost
d) Marketing strategy
Answer: d) Marketing strategy
Rationale: Although marketing strategy is important in determining
demand, it is not a factor in planning the production system itself.
3. What is the purpose of operating a production system?
a) To design the layout of the production facility
b) To ensure the production system is running efficiently
c) To determine the capacity needed for production
d) To set production schedules
Answer: b) To ensure the production system is running efficiently
Rationale: Operating a production system involves managing the day-today activities to ensure optimal efficiency.
4. Which of the following is NOT a method for controlling a production
system?
a) Quality control
b) Inventory management
c) Employee training
d) Financial analysis
Category | Exams and Certifications |
Comments | 0 |
Rating | |
Sales | 0 |