RECA RESIDENTIAL EXAM ACTUAL EXAM 200 QUESTIONS AND DETAILED ANSWERS|AGRADE

RECA RESIDENTIAL EXAM 2023-2024 ACTUAL

EXAM 200 QUESTIONS AND DETAILED

ANSWERS|AGRADE

Trustee - ANSWER- Legally appointed person to hold assets for benefits of

one or more persons. Trust agreements set out terms of trustee's powers

and duties.

Executors - ANSWER- Person who receives title of property when owner of

the property is deceased.

Development permits - ANSWER- -Used for new subdivisions.

-Authorizes location, size and use of building.

Building permits - ANSWER- -Used for new residential buildings.

-Valid for one year in which building must proceed.

-ABC establishes technical specifications for new buildings.

Occupancy permits - ANSWER- -Used for new residential buildings. Builder

must secure permit before residence is approved for occupation by

purchaser.

Subsequent building permits - ANSWER- -Used to change existing

buildings.

-Required for new additions, demo or relocation, Major alterations or

renovation, supplemental structure.

Concepts of residential construction - ANSWER- -Technology

-Sustainability

-Accessibility

-Adaptability

Technology - ANSWER- -the process of implementing single application to

operate multiple functions of a property

Sustainability - ANSWER- -Use and recycling of materials used in

construction


Accessibility - ANSWER- -Individuals ability to access a building, move

within and independence without barriers. IE Ramps, lifts elevators.

Adaptability - ANSWER- -How easy it is to change a home to meet a

client's need, ie a home to grow old in.

Developer warranty programs - ANSWER- -1 year warranty on

materials/workmanship used to construct residence, begins when buyer

takes possession.

Extended warranty programs - ANSWER- -In conjunction with builder's

warranty, provides 10-year protection against structural defects.

Manufactured construction - ANSWER- -3 sections almost complete (up to

95%)

-Minimal time required to join and complete sections.

Modular construction - ANSWER- -Three-dimensional, combined to create

cohesive building.

-85% complete, few weeks to fully develop.

Panelized construction - ANSWER- -Prefabricated wall, floor or roof panel.

-Partial wall panel is framing sheathing.

-Completed wall panel include windows and or siding.

Building substructure - ANSWER- Below grade construction of foundation.

Building superstructure - ANSWER- Above grade construction of building.

-Envelope, service systems, interior building features.

Building envelope - ANSWER- -Everything that encloses structure and

protects from elements.

-Roof, exterior walls, windows, exterior doors and interior walls.

Interior building features - ANSWER- -Interior finishes that complete

interior.

-Interior walls, features, finishes, fixtures, lighting, floor, ceiling,

kitchen/bathroom cabinets.


Building service systems - ANSWER- Essential services, connected to

applicable municipal services

-Heat, electricity, water

Building lot - ANSWER- Lot grading, landscaping and other exterior

components.

-Landscaping, walkways, driveway, fences.

Poured concrete - ANSWER- Cement, gravel, aggregate and sand. Poured

from mix trucks into large foundation molds known as forms.

-Strengthened by reinforced steel bars (rebar)

Cement block - ANSWER- Poured concrete, cement, gravel aggregate and

sand. Fills blocks that are hollow but filled with mortar and reinforced with

rebar.

Preserved wood - ANSWER- Load bearing walls built with treated lumber

and sheathed with treated plywood.

-Wood used is treated with preservative chemicals to prevent decay and

layered with mortar.

-Requires certification before usage.

Damp proofing - ANSWER- Asphalt-based film or coating applied to below

grade exterior of foundation walls during construction process.

-Reduces passage of water vapor into foundation walls

Waterproofing - ANSWER- Seamless membrane or spray is applied to

exterior of foundation walls. Alternatively, compound can be added to

concrete foundation mixture.

-Prevents water vapor and liquid water from penetrating foundation walls.

Subsurface drainage: Drain tiles - ANSWER- Perforated piping surrounded

by aggregate rock, placed along foundation footings or beneath concrete

slab.

-AKA weeping tile, directs water to municipal storm sewer system or to

sump pit containing sump pump.

Subsurface drainage: Sump pump - ANSWER- Lined hole of shaft, two feet

in diameter. Draws water away from foundation and redirects it to municipal

storm water system or rock pit (rural).


No comments found.
Login to post a comment
This item has not received any review yet.
Login to review this item
No Questions / Answers added yet.
Price $21.00
Add To Cart

Buy Now
Category Exams and Certifications
Comments 0
Rating
Sales 0

Buy Our Plan

We have

The latest updated Study Material Bundle with 100% Satisfaction guarantee

Visit Now
{{ userMessage }}
Processing