Chapter 1
1. During the ____ phase, the architect, other design consultants, and the owner mutually determine the goals and
objectives of the project.
a. pre-design b. CD
c. project delivery d. design build
ANSWER: a
POINTS: 1
QUESTION TYPE: Multiple Choice
HAS VARIABLES: False
DATE CREATED: 7/6/2021 2:31 AM
DATE MODIFIED: 7/6/2021 2:32 AM
2. Construction specifications for buildings and other projects are written using the ____.
a. Facilities Services Subgroup b. MasterFormat system
c. General Conditions clause d. Design-Bid-Build method
ANSWER: b
POINTS: 1
QUESTION TYPE: Multiple Choice
HAS VARIABLES: False
DATE CREATED: 7/6/2021 2:36 AM
DATE MODIFIED: 7/6/2021 2:42 AM
3. The construction documents include a written manual called the ____.
a. clarifications b. specifications
c. CDs d. MasterFormat
ANSWER: b
POINTS: 1
QUESTION TYPE: Multiple Choice
HAS VARIABLES: False
DATE CREATED: 7/6/2021 2:37 AM
DATE MODIFIED: 7/6/2021 2:38 AM
4. In addition to the purely technical information, division ____ of the specifications outlines the guidelines for the preconstruction phase of the project.