When the side cover of Precision Tower 7920 is not assembled, the system will
still power on. - ✔✔False
On Latitude 14 Rugged Extreme - 7414, which light is used to communicate error
using Single LED ? - ✔✔not Power light
We Import a Foreign configuration in a RAID Array, if: - ✔✔The array containing
foreign configuration is in an Offline state
Select statements that are true about Trusted Platform Module (TPM) - ✔✔not
The Trusted Platform Module (TPM) is used to generate and store keys
After completing a service incident on a Precision Tower 7920, technician
attempts to run ePSA before re-assembling the side cover. However, system is not
able to power on and displays LED error code of 4-7. What could be the issue? -
✔✔The intrusion switch is triggered and power is cut-off. Install the side cover to
de-activate the intrusion switch.
Before replacing any hardware, what is the recommended solution for the BSOD
or system freezing? - ✔✔not Reseat the DIMMs
If an Edge Gateway is Blinking green after the diagnostics, what does it indicate? -
✔✔ePSA Pass
On a Precision Workstation, if a Hard drive status indicator flashes green, amber
and then turns off; this indicates the drive is rebuilding - ✔✔False
In general, an Anti-Static Mat is used to prevent Electrostatic damage - ✔✔True
Category | exam bundles |
Comments | 0 |
Rating | |
Sales | 0 |